Niet destructief materiaal onderzoek (NDO) & Inspectie
Montage, Rigging & Lifting
Wij geven trainingen en advies

Assembly 250 m2 floor

This is one of the last jobs of this year. 

The assembly of a 250 square meter floor in a energy plant. Using a truss with counterweight at the back to lift the beams at the front. Rope Access is used to safely assemble the beams and floor. 

 
 

 

Foto's: 
Rope Access Group BV
Rope Access Group BV
Rope Access Group BV
Rope Access Group BV
Rope Access Group BV
Rope Access Group BV
Rope Access Group BV
Website by eRush.nl