Total Access project

A project we are proud of. In the final stage of the building of an offshore installation we were asked for assistance. For a period of 7 weeks we did with a team of up to 9 men several jobs varying from painting and leaktesting of flanches, to inspection of cranes and lifeboatsupports.

In the final stage scaffolds are taking away from the different decks. From that moment on every place that is difficult to reach, needs to be reached by means of rope access.