Rope Access Group
Services
Projects
Contact
Projects
Shackle change out
Disassembly cage ladder 100m. stack
Structural Steel paint touch-up
Installation of 250 m² floor
Cleaning cables of the Botlek Bridge
Offshore windmill park project successfully finished!
Lifting Pipelay vessel
Measurements new Botlekbridge
Installation of logo on transmission tower
ET inspection crane
Inspection & greasing steel cables
Bridge inspection
Rope access NDT & welding
Coating of boilerwall in France
Cleaning flue gas wash tower
Welding & NDT inspections
Inspection of Oil Tanker
Visual Inspection of Steel Structure
NDT (Non-Destructive Testing) at Refinery
Cleaning of Roof Surfaces on Gas Turbine
Installation on Platform Jacket
Welding on Boiler
Wall Thickness Measurements on Boiler & Cyclone
Wall Thickness Measurements on Bridge
Total Access project
Assistance Lifting Operations