For almost one year at a powerplant building site, we assisted in the construction of concrete plating. A crane positioned concrete plates on top of each other. Inside the steel structure rope access personnel were attaching the plates (with torque wrenches) to the steel structure of the building.
Next to these activities we did magnetic inspections and welding in the boiler.