Rope Access Group
Services
Projects
Contact
Projects
Shackle change out
Disassembly cage ladder 100m. stack
Repair waste disposal
Building maintenance
Installation drainpipes
Construction paint touch-up
Offshore painting
Cleaning Boiler
Disassemble steel construction on pipelay vessel
NDT inspection & welding
Assembly 250 m2 floor
Assembly at stormsurge
Cleaning boiler house
Cleaning cables new botlekbridge
NDT flarestack
NDT offshore windpark
Inspection gas sphere, acoustic emission
Assistance lifting operations
Inspection Steelconstruction
Standby rescue confined space
NDT jack-up vessel
Rope access industrial cleaning
Drain assembly helideck
Construction work New Botlek bridge
Spot repairs offshore
Offshore paint repairs
Inspection & spot repair offshore converter station
W@H & Rescue Training pipelay vessel
Painting offshore jacket
Offshore windmill park project successfully finished!
Tank entry & NDO in Barge, Mexico
Disassembly cabletray LNG tank
Lifting Pipelay vessel
Measurements new Botlekbridge
NDT Refinery
Offshore windfarm
Assembly logo radio tower
Assembly cargo tanks
Cleaning fly ash silo
ET inspection crane
Inspection & greasing cables
Inspection & repare cooling tower
Flarestack inspection helicopter (Video)
Installation mega banner
Repair ammonia tank
Inspection & secure area after explosion
Pipe removal barge
Bridge inspection
Rope access NDT & welding
Cleaning of boiler
Coating of boilerwall in France
Assembly cable trays
Cleaning flue gas wash tower
Helideck Netting FPSO
Welding & NDT inspections
Total Access project