Wall thickness measurements were performed on the cable drum guides of a bridge in the Botlek area.
Work on or around bridges is almost always well-suited for rope access techniques. Traffic and shipping disruptions are minimal, the project timeline is short, and as a result, the overall cost is highly advantageous.